Plug & Process Load Management
Control the energy your building systems leave behind.
Lighting and HVAC are managed. The hundreds of printers, displays, charging carts and PTAC units in the same building usually are not. BERT measures them, switches them off when nobody needs them, restores power before anyone does, and reports the savings.
Sources: plug-load share - NREL, Assessing and Reducing Plug and Process Loads in Office Buildings (33% of U.S. commercial building electricity). Savings figures are BERT planning ranges, validated per project; see how we calculate savings.
Where do you fit?
I manage facilities
Cut after-hours energy across schools, campuses, offices and public buildings without changing how people work. Buy outright or through Smart Energy Suite with little or no upfront capital.
Ways to buy →I sell or develop energy projects
ESCOs, manufacturers' reps, trade allies and engineering firms add BERT as another measurable ECM. You keep the customer relationship; BERT brings the plug-load expertise.
Partner program →I design and specify
Guide specification Section 26 09 80, application guidance, product data and savings methodology for engineers, A/E firms and technical reviewers.
Engineer resources →Measure. Analyze. Control. Report.
Every BERT controller measures the load it serves. That data drives the control strategy and proves the result.
Measure
Device-level power and energy data from every controlled load, accurate to ±3%.
Analyze
Review runtime, standby, cycling and schedule opportunity before anything is switched.
Control
Owner-approved schedules plus threshold and temperature logic. A local override is always available.
Report
Consumption and savings by device, group, building or portfolio in BERTBrain.
In stadiums, school districts and universities
Other BERT installations include Jersey City Public Schools, Newark Public Schools, UC San Diego and the University of Michigan-Dearborn.
One platform, from retrofit plug-ins to smart wall outlets

Smart Plug 110AP
Plug-in control for 120 V devices up to 15 A. Fast to deploy across large device populations.

Inline Series
Hardwired control for approved 20 A and 30 A loads up to 250 VAC.

Wall Outlet 110WO
Two independently controlled receptacles in a standard wall outlet. Coming late Q4 2026.

BERT Edge Gateway
One compact gateway runs BERTBrain for an entire system. No customer server needed.
Find the unmanaged energy in your buildings.
Tell us about your facilities and we will size the opportunity: device counts, control hours and a savings range you can take to your team.