Plug & Process Load Management

Plug and process loads (PPL) are the electrical devices that sit outside traditional HVAC and lighting control. Individually they may be modest. Collectively, and left running overnight and on weekends, they are one of the largest unmanaged energy costs in a building.

The control gap

Building automation systems focus on HVAC, central plant and selected lighting. The printers, displays, classroom technology, charging carts, water coolers, vending machines, PTAC units and exhaust fans throughout a building are usually outside that control. They stay energized during unoccupied hours even when idle or in standby.

NREL estimates plug and process loads account for about a third of U.S. commercial building electricity, and their share grows as lighting and HVAC become more efficient.

Source: NREL, Assessing and Reducing Plug and Process Loads in Office Buildings.

Empty open-plan office at night with monitors, lamps and printers still switched on

Plug load control, not a timer

  • Commercial-grade controllers with device-level metering
  • Schedules stored locally, so control continues if Wi-Fi or the internet drops
  • Central scheduling, reporting and system health in BERTBrain
  • Standalone by default; optional BACnet/IP or REST integration

What a plug load management system controls

BERT targets noncritical equipment with meaningful energy use and predictable periods when it is not needed.

Load classExamplesTypical BERT approach
Plug-connectedWorkstations, printers and copiers, displays, AV equipment, charging carts, vending, water equipment, selected breakroom and comfort loadsSmart Plug 110AP on the individual device or an approved workstation group
Hardwired / processPTAC/PTHP, window AC, exhaust fans, water heating, selected lighting and other approved loads outside BAS controlInline controller at the device, partial circuit or circuit, installed by a licensed electrician
Permanent receptaclesOffices, classrooms, conference and break rooms in new construction and renovationWall Outlet 110WO (preliminary; late Q4 2026)
Software & fleetSites, buildings, floors, rooms, device types, departmentsOrganize, schedule, report and benchmark in BERTBrain

What a BERT controller does - and does not do

It does

  • Measure the connected load and remove or restore full line power according to approved logic
  • Store essential schedules locally, so approved control continues through communication interruptions
  • Restore power before scheduled use, with a manual override at every controller

It does not

  • Dim, regulate or limit voltage or current. When on, the device gets normal line power.
  • Control life-safety, emergency, security, medical-support, server or core network equipment
  • Get applied to a load before its ratings, shutdown and restart behavior, and owner approval are confirmed

Plug load control strategies that follow the load

The project team first confirms what the equipment must do, then selects the simplest approved strategy that saves energy without disrupting operation.

Scheduling

Occupied, unoccupied, seasonal, holiday and special-event patterns. Power returns before required use.

Threshold

For cycling equipment such as PTACs or projectors: power is removed only after measured demand shows the active or cooldown cycle has ended.

Temperature

High and low setpoints for approved equipment, with minimum cycle intervals and restart safeguards.

Works with or without your building automation system

BERT normally runs standalone, so there is no BAS change and no customer-provided server. Where a project benefits, BERT Connect provides separately scoped BACnet/IP integration, and a REST interface is available for other systems. BERT complements a BAS; it does not replace one.

Where PPL fits among ECMs

PPL is often the next scalable measure after lighting upgrades. It installs with limited disruption, and it can produce savings while larger HVAC or envelope projects are still being designed.