See how school districts, campuses and venues use BERT to switch off the energy their buildings waste when nobody’s there. Each project’s savings depend on how many devices BERT controls, what they are, and when the building is empty. That’s exactly what a site review pins down.

K-12 · North Carolina

Hoke County Schools

~90,000kWh saved a year (published study)
638BERT Smart Plugs

638 BERT Smart Plugs across 12 schools and the Board of Education switch off vending machines, charging carts, projectors, printers and water coolers overnight, on weekends and on holidays.

K-12 · Connecticut

Waterbury Public Schools

201,247kWh saved a year
4.2 yrssimple payback, net of incentives

In a 14-measure performance contract, BERT plug load control was one of the first measures completed, and it had the fastest payback of all 14.

K-12 · California

Magnolia School District

69,901kWh saved a year
+35%more savings after adding Smart TVs

Working with district IT to bring classroom Smart TVs under control raised annual savings by about a third, using the same number of controllers.

K-12 · Pennsylvania

Fairfield Area School District

65%lower overnight standby plug-load energy cost
5,700+hours a year devices are off

A rural district whose buildings are occupied only about 35% of the time now switches classroom, office and break-room devices off for more than 5,700 hours a year.

Venues & Commercial · Chicago

Soldier Field

$24,000a year in labor savings
564BERT Smart Plugs

Facilities staff now switch every luxury suite's TVs and refrigerators from one office, instead of visiting 133 suites before and after every event.

Project Spotlight · New Jersey

Jersey City Public Schools

3,800BERT devices
44buildings

One of BERT’s largest deployments: 3,800 BERT devices across 44 buildings and 5.5 million square feet of educational space, delivered with DCO Energy as part of the district’s Energy Savings Improvement Program.

Project Spotlight · California

UC San Diego

2,500BERT Smart Plugs
10campus buildings

A California Energy Commission–funded demonstration that integrates 2,500 BERT Smart Plugs with the campus Johnson Controls Metasys® building automation system across 10 campus buildings.

White Paper · Strategy & Market · September 2026

The Unmanaged Third: Why Plug and Process Loads Are the Biggest Uncontrolled Load in Commercial Buildings

Plug and process loads are about a third of a typical commercial building’s electricity, yet they are rarely controlled. What’s inside that third, why the gap has persisted, and what becomes possible once it’s measured and controlled.

Watch: BERT + Your BAS (0:25)
  1. Your BAS runs HVAC and selected lighting.
  2. BERT reaches the plug and process loads it doesn’t.
  3. Runs on its own; no BAS required.
  4. Optional: BERT Connect exchanges approved device data and commands with your BAS over BACnet/IP.
  5. If the BAS link, Wi-Fi or the internet drops, each controller keeps running its stored schedule.

White Paper · Technical · September 2026

Plug Load Control and the Building Automation System: Complement, Not Replace

Why a building automation system and plug load management do different jobs, why whole-building integration between them has been rare, and how plug load control works standalone by design and connects to a BAS through open protocols when a project calls for it.

White Paper · Programs & Policy · September 2026

Measured, Not Assumed: Device-Level Metering and M&V for Plug Load Control

How a credible plug load program moves from an early estimate to a measured post-installation baseline and ongoing device-level reporting, and what “measured” should mean to an owner, an ESCO or a utility program reviewer.

White Paper · Programs & Policy

Best Practices for Monitoring and Reducing Plug & Process Loads

A practical overview of how facilities cut plug and process load energy: choosing a champion, auditing devices, building the business case, device-specific tactics, occupant engagement, and the main control technologies.

Commercial office and state and local government stories are coming. Have a BERT project you’d like to share? Talk to BERT.

Want Numbers Like These for Your Buildings?

Start with a screening estimate in a minute, or tell us about your facilities and we’ll size the opportunity with you.